Rear and side additions, second storeys, bump-outs and conversions of existing volume, designed and built under one licence. We take the project from the structural question through stamped drawings and plan check to final inspection.
A home addition extends the house you already have, sharing its entrance, kitchen and systems. It is reviewed under your local zoning ordinance rather than under the state ADU rules, which means the setbacks, size limits and fees are different. Ecostep designs and builds additions across six Bay Area counties under CSLB licence #1006147.
This page covers the five kinds of addition, how an addition compares with an ADU including when the ADU route is the better one, what actually drives the cost, and what it is like to live in the house while the work runs. It does not price your project or interpret your local ordinance for your parcel.
The options
Which one suits your property is usually decided by the lot, the existing roof structure and how much of the house you can live without while the work runs.
| Type | What it is | The usual constraint |
|---|---|---|
| Single-storey rear or side addition | Extending the footprint outward at ground level | Rear and side setbacks, lot coverage and floor area ratio under the local ordinance. Also whether a concrete truck can reach the pour. |
| Second-storey addition | Building up over part or all of the existing footprint | The existing foundation and framing have to carry it, so this one usually starts with a structural engineer rather than a designer. |
| Bump-out | A small extension of one room, often a few feet, to make a layout work | Roof tie-in. A bump-out is cheap in square footage and expensive in flashing and detailing. |
| Garage conversion to habitable space | Turning the garage into part of the house rather than into a separate unit | Envelope, insulation and floor level. Treated as an addition, not an ADU, because it is not self-contained. |
| Attic or basement conversion | Making existing enclosed volume habitable | Ceiling height, egress, stair geometry and, in a basement, moisture. Cheapest in materials, often the fussiest in code. |
Addition or ADU
An addition and an accessory dwelling unit both add finished square footage, and they are reviewed under completely different rules. Getting this wrong is expensive, because the approval route, the setbacks and the fees all change.
| Home addition | Accessory dwelling unit | |
|---|---|---|
| What it is | More house. Shares the entrance, kitchen and systems with the existing home. | A second, self-contained home with its own entrance, kitchen and bathroom. |
| Approval route | Normal plan check under the local zoning ordinance, with the usual discretionary review where it applies. | State law provides a ministerial route: fifteen business days to a completeness check and sixty calendar days to a decision. |
| Setbacks | Whatever the local ordinance requires, which is often considerably more than four feet. | A city generally cannot demand more than four feet from the side and rear property lines on a new unit. |
| Size limits | Set by local lot coverage and floor area ratio rules. | Up to 1,200 sq ft in most jurisdictions, with an 800 sq ft unit protected from lot coverage and minimum lot size rules. |
| Parking | Local ordinance applies. | None can be required within half a mile of transit, and no replacement parking on a garage conversion. |
| Impact fees | Normally applicable. | Prohibited on a unit of 750 sq ft or less of interior livable space. |
| Can it be rented separately | No, it is part of the house. | Yes. Owner occupancy was permanently removed by AB 976. |
| Best when | You want a bigger house: another bedroom, a primary suite, a real kitchen, a room that works. | You want rental income, a separate household, or the most finished square footage a built-out lot will take. |
In short: an addition is the better answer when you want the house itself to be bigger, and an ADU is the better answer when you want a second household or an income. On a tight lot the ADU rules are often more permissive than the addition rules, which surprises people. It is worth checking both routes on your parcel before assuming. The ADU guide sets out the state rules in full.
What drives the cost
A square foot of new bedroom on a flat rear yard and a square foot of second storey over an existing kitchen are not the same product. These are the things that decide the number.
Recorded values on our residential building permits run from $25,000 to $210,000. That is the public record rather than a quote.
Living through it
Unlike a whole-house remodel, an addition often lets you stay put, which is most of its appeal. It also means the site setup matters more than people expect. A construction budget carries real lines for turning a home into a working site and keeping it liveable: onsite supervision, sanitary facilities, temporary fencing and security barriers, temporary tree and plant protection, and progress cleaning through the job rather than only a final clean at the end.
Those are real costs, and they belong in the budget as visible lines when somebody is sleeping thirty feet from the framing.
Residential building permits are public record, each carrying a licence number, a scope and a valuation. Ecostep's permitted work includes whole-house remodels in Berkeley and Fremont, accessory dwelling units in Alameda, Berkeley and Concord, and kitchen and bathroom work in San Francisco, Belmont and San Leandro. We work across Contra Costa, Alameda, San Francisco, San Mateo, Santa Clara and Marin counties.

Before the drawings
On an addition the first questions are what the new work lands on and where the new roof meets the old. A feasibility visit answers both, along with setbacks, lot coverage, panel capacity and whether equipment can reach the work.
Questions
An addition makes the house bigger and shares its entrance, kitchen and systems. An ADU is a second self-contained home with its own entrance, kitchen and bathroom. The practical difference is the approval route: ADUs get a state-mandated ministerial path with a four foot setback cap and a sixty day decision, while an addition is reviewed under your local zoning ordinance with its own setbacks, lot coverage and floor area ratio. On a tight lot the ADU rules are often more permissive, which catches people out.
Yes. Any habitable addition requires a building permit, and the drawings have to satisfy plan check. We prepare and submit the stamped construction drawings, answer the plan check comments and carry the application through to an issued permit before work starts, with our licence number on it.
Unlike an ADU, an addition does not get the state's fifteen business day completeness check or its sixty day ministerial decision. It goes through normal plan check under the local ordinance, so the timeline depends on the jurisdiction and on how many rounds of corrections the submittal package generates. A set that anticipates the usual local comments goes through in fewer of them.
Often, but it starts with the structure rather than the design. The existing foundation and framing have to be able to carry the new load, and that usually means a structural engineer looking at it before anyone draws a floor plan. Height limits and, in some jurisdictions, daylight plane or setback rules for upper storeys also apply.
Recorded values on our residential building permits run from $25,000 to $210,000, which gives you the shape of it without pretending to be a quote. An addition is priced by what it touches rather than by its floor area: the structural interface, the roof tie-in, extending the plumbing and electrical, the foundation, and the envelope where new construction meets an older building. A bump-out of a few feet can cost more per square foot than a larger rear addition because the detailing is harder.
Sometimes. It depends on the existing panel's capacity and what the new space needs, and it is one of the first things worth checking because it is a meaningful line in the budget rather than a detail. Extending the heating system is the same kind of question: whether what is there can carry the extra volume.
Usually yes, and that is a large part of why people choose an addition over moving. It does mean the site setup matters: onsite supervision, sanitary facilities, temporary fencing, tree and plant protection, and progress cleaning through the job rather than just at the end. Those belong in the budget as visible lines.
Yes. Converting a garage into part of the house is treated as an addition, because the space is not self-contained. It is a different permit route from a garage conversion ADU and it has different consequences for setbacks, fees and whether the space can be rented. Worth deciding deliberately rather than by accident, since the ADU route can carry fee exemptions the addition route does not.
Specialist consultants are brought in where the site or the structure calls for them, most often structural, geotechnical, soils, civil or energy. On a second storey the structural report comes first and the design follows it. Those reports are soft costs and sit outside the construction budget, which is worth knowing when you compare quotes.
A ratio between total floor area and lot size set by your local zoning ordinance, used to cap how much building a parcel can carry. Along with lot coverage and setbacks it is one of the constraints that decides an addition's size, and unlike the ADU rules there is no state provision overriding it. Checking it is part of the feasibility stage.
We do. Our licence number, CSLB #1006147, goes on the application, which means the work is inspected against our licence rather than against you as an owner-builder. If you pull it yourself you take on responsibility for every development standard and for code compliance across the whole project.
Contra Costa, Alameda, San Francisco, San Mateo, Santa Clara and Marin counties. Our permitted residential work on public record sits in Alameda, Berkeley, Concord, Fremont, San Francisco, Belmont and San Leandro.
President and responsible managing officer of Ecostep, Inc. Amer has worked in the trades since January 1986, completed a union apprenticeship and earned his Journeyman Heat and Frost Insulator card in 1995, and has been a licensed California general contractor since 2003. Before founding Ecostep in 2015 he worked refineries, power plants, pharmaceutical plants, offshore platforms and ships, and opened a cabinet shop in Pittsburg.
Page last reviewed September 2026. California ADU statute is amended most years, so figures on this page carry the date they were checked. Verify anything decision critical against your local planning department before you rely on it.