Do you handle the permit, or do I?
We do. We prepare the stamped construction drawings, submit them, answer plan check comments and carry the application through to an issued permit before work starts. Our licence number goes on it, which also means the work is inspected against our licence rather than yours.
What does design-build mean in practice?
One firm holds both halves of the job. Feasibility study, project planning, conceptual design, code analysis, stamped construction drawings and interior design sit with the same company that then frames, insulates, plumbs and finishes the building. You are not managing a handover between an architect and a contractor who have never worked together.
How big can my ADU be?
Most residential lots in California can take a detached ADU of up to 1,200 square feet, and an 800 square foot unit is protected by state law. What your particular parcel will carry depends on lot coverage, the existing structures and the local objective standards, which is what the feasibility study settles.
How close to the property line can it go?
For a new attached or detached ADU, a city generally cannot require more than four feet from the side and rear property lines. If you are converting an existing garage or accessory structure, or rebuilding on the same footprint, no new zoning setback applies.
How long does the permit take?
Once an application is complete, the agency has sixty days to approve or deny it, and a denial must list exactly what needs correcting. Since 1 January 2026 the agency also has fifteen business days to tell you whether the application is complete. Getting to a complete application is the part that varies, and it is the part we handle.
Do I need to add parking?
Usually not. No parking can be required if the property is within half a mile of public transit, and replacement parking is not required when you convert a garage into a dwelling.
Do I have to live on the property?
Not for a standard ADU. Owner occupancy was permanently removed by AB 976, so the unit can be rented. For a junior ADU, AB 1154 narrowed the requirement from January 2026 so that it applies only where the JADU shares a bathroom with the primary dwelling.
Full ADU guide.
Can I sell the ADU separately later?
Only where your city or county has opted in under AB 1033, and it is a condominium conversion rather than a lot split. Of the counties we work in, San Francisco has opted in and San Jose has opted in for Santa Clara County, and as of the latest reporting no city in Marin, Contra Costa, Alameda or San Mateo had.
How splits and separate sale work.
What do those licence classifications actually cover?
B is general building, which lets us hold the prime contract on a whole structure. C-2 is insulation and acoustical. C-6 is cabinet, millwork and finish carpentry. C-36 is plumbing. Four classifications on one licence means fewer separate contracts and fewer gaps between trades where schedules slip.
Do you build the cabinets yourselves?
Yes. We run our own wood shop with a five by twelve foot CNC router, where we make custom furniture, reception desks, custom trim, built-ins and high-end cabinets. It is a shop that puts modern production methods next to traditional craftsmanship rather than choosing between them.
What will my project cost?
Recorded values on our residential permits run from $25,000 to $210,000, which gives you the shape of it. A real number needs a site visit, because on an ADU the lot, the setbacks, the utility runs and the slope move the figure more than the finishes do. We put the scope and the price in writing before anything is ordered.
Which areas do you work in?
Contra Costa, Alameda, San Francisco, San Mateo, Santa Clara and Marin counties. Our permitted work on public record sits in Alameda, Berkeley, Concord, Fremont, San Francisco, Belmont and San Leandro.